Class 50
10th June 2006




<-- Index | Showing 1-39 of 39 pictures | Index -->
50007 - Dirty windscreens
50007 - Dirty windscreens
50007
50007
50007
50007
50007 - Close up of roof weathering
50007 - Close up of roof weathering
50008 - Bodyshell now ready for some major weathering.
50008 - Bodyshell now ready for some major weathering.
50008 - Weathering has now reached an advanced stage, although there are still lots of things to do before this loco could be considered complete. When it's finished, this one is shaping up to be a bit of a show stopper.
50008 - Weathering has now reached an advanced stage, although there are still lots of things to do before this loco could be considered complete. When it's finished, this one is shaping up to be a bit of a show stopper.
50008
50008
50008
50008
50008
50008
50012
50012
50012
50012
50012 - Hornby pipes, just cant beat them. Note the fixings of the Heljan snowploughs - just attached to the ETH boxes with epoxy resin.
50012 - Hornby pipes, just cant beat them. Note the fixings of the Heljan snowploughs - just attached to the ETH boxes with epoxy resin.
50012
50012
50012
50012
50018
50018
50018
50018
50018
50018
50018
50018
50018
50018
50018
50018
50018
50018
50025
50025
50028
50028
50028
50028
50028
50028
50032
50032
50032
50032

Number 1 end, windscreens require 'dirtying'.
Number 1 end, windscreens require 'dirtying'.

50035
50035
50035
50035
50035
50035
50036
50036
50036
50036
50046
50046
50046
50046
50047: Part repaint from the old 'Ark Royal' base model. No weathering was specified.
50047: Part repaint from the old 'Ark Royal' base model. No weathering was specified.
50047: Part repaint from the old 'Ark Royal' base model. No weathering was specified.
50047: Part repaint from the old 'Ark Royal' base model. No weathering was specified.
Powered by WebRing.